ErinoakKids Centre for Treatment and Development
- Location:
- Brampton, Oakville and Mississauga
- Project Type:
- DBF - Design Build Finance
- Infrastructure Type:
- Children and Youth Services
- Contract Value:
- $163.33 million
- Estimated Value for Money:
- $41.5 million
About the Project
The ErinoakKids Redevelopment project involved the construction of three new purpose-built facilities for children and youth with physical, communication and developmental needs. The main facility in Brampton is approximately 160,000 square feet. The Mississauga and Oakville sites are each approximately 62,000 square feet. The project has allowed ErinoakKids to consolidate its sites from nine to four - three new sites in Brampton, Mississauga and Oakville, and a fourth satellite location in Orangeville.
Status:
-
Request for QualificationsFeb 04, 2013
-
Short-list Bidders SelectedJul 26, 2013
-
Request for ProposalsOct 29, 2013
-
Winning Bidder SelectedNov 10, 2014
-
Construction BeginsMay 01, 2015
-
Construction EndsDec 01, 2017
Latest News
Winning Bidder
Peel-Halton Partnership; Constructor: Bondfield Construction Company Limited; Architects: Stantec Architecture; Financial Advisor: Rocklynn CapitalĀ
Features
- Autism services such as intensive behavioural intervention and applied behavioural analysis
- Infant hearing and blind low vision services
- Physiotherapy and occupational therapy services, including accessible playgrounds and outdoor therapy spaces
- Speech and language services assistive
- Devices resources services
- Medical, nursing and specialty medical services
- Respite services, including a 26-bed regional respite centre at the Brampton site
- A warm water therapy pool at the Brampton site
- Family support services
Community And Green Benefits
The new facilities ErinoakKids in its mission to help children and youth with physical, developmental and communication needs achieve optimal levels of independence, learning, health and well-being.
The sites are also:
- Fully accessible by public transportation
- Designed and built to LEED Silver standard
- Built with green roofs, allowing ErinoakKids to manage its own stormwater and maximize outdoor space.
Economic Benefits
At the peak of construction, approximately 200 construction workers were on site daily.
Terms of Use
These project documents are being made available on this website for informational purposes only. Neither Infrastructure Ontario nor ErinoakKids makes any representation or warranty regarding the accuracy or completeness of the content or form of these documents.
Infrastructure Ontario and ErinoakKids, in their sole and absolute discretion, may choose to make available on this website amendments, revisions, modifications or replacements to these documents. These documents remain open for further revision, modification, replacement or cancellation by Infrastructure Ontario and ErinoakKids at any time and in no event shall either Infrastructure Ontario or ErinoakKids be responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use of or reliance on the content of these documents.
Related Links
Announcements
- Planning, Design and Compliance Team Selected - Oct. 12, 2012
- Request for Qualification Issued - Feb. 4, 2013
- Short Listed Proponents Named- July 26, 2013
- Request for Proposals Issued - Oct. 29, 2013
- Request for Proposals Closed - April 29, 2014
- Financial Close - Nov. 10, 2014
- Backgrounder
- Construction Work Starts - May 1, 2015