Infrastructure Ontario (IO) and Grandview Kids have invited three teams to respond to a request for proposals (RFP) to design, build and finance the Grandview Children’s Treatment Centre Redevelopment project.

The three teams were shortlisted based on criteria identified in a request for qualifications process that began in September 2020. Selection criteria included design and construction capability, experience, qualified personnel and financial capacity to undertake a project of this size and scope.

The shortlisted teams and their prime team members are:

CHILDREN’S FIRST CONSORTIUM

  • Applicant Lead: Amico Design Build Inc. (50%), Sacyr Construction S.A (50%)
  • Design Team: H.H. Angus and Associated Limited, Parkin Architects
  • Construction Team: Amico Design Build Inc. (50%), Sacyr Construction S.A (50%)
  • Financial Advisor: Stonebridge Financial Corporation

ELLISDON INFRASTRUCTURE HEALTHCARE

  • Applicant Leads: EllisDon Corporation
  • Design Team: Montgomery Sisam Architects Inc.
  • Construction Team: EllisDon Corporation
  • Financial Advisor: EllisDon Capital Inc.

GRANDVIEW CONNECTION GROUP

  • Applicant Lead: Pomerleau Inc.
  • Design Team: Stantec Consulting Ltd., Stephenson Engineering Limited, Quasar Consulting Group Inc.
  • Construction Team: Pomerleau Inc.
  • Financial Advisor: Pomerleau Inc.

Teams will now begin preparing proposals that detail how they will deliver the project. Once submissions are received, Infrastructure Ontario and Grandview Kids will evaluate the proposals, select a preferred team and then negotiate a final contract. A successful bidder is expected to be announced in spring 2022. A fairness monitor will oversee the entire procurement process.

Infrastructure Ontario and the Ministry of Children, Community and Social Services are working with Grandview Kids on the project.

A copy of the RFP and more details about the project are available on the Grandview Children’s Treatment Centre webpage.

Disponible en français