Quinte Detention Centre Expansion
- Location:
- Greater Napanee
- Project Type:
- DBB – Design Bid Build
- Infrastructure Type:
- Justice
- Contract Value:
- $178 million
About the Project
As part of the government’s plan to increase adult correctional capacity, the Quinte Detention Centre in Greater Napanee is being expanded to add 91 new beds. The expansion will bring the institution’s capacity to over 300 beds.
This project is part of the Ontario government’s commitment to increase capacity at several adult correctional facilities to ensure staff and inmate safety as well as sufficient capacity in both the short- and long-term.
Status:
-
Request for QualificationsOct 10, 2024
-
Short-list Bidders SelectedNov 18, 2025
-
Request for ProposalsNov 18, 2025
-
Winning Bidder SelectedOct 26, 2026
-
Construction BeginsOct 26, 2026
-
Construction Ends
Latest News
Key Project Participants
- EBC Inc.
- Design: Stantec Architecture Ltd.
- Legal: Norton Rose Fulbright Canada
- Fairness Monitor: Lakeland Consulting Inc.
Features
The project will include expansions to the following areas:
- Increased accommodation for women.
- Health services and infirmary.
- Admitting and discharge.
- Additional recreational service areas.
- Institutional Crisis Intervention Team (ICIT) area/designated room.
The project also includes staff and executive administration facilities, new public and staff entrances, reception and visitation, and new parking for staff and visitors.
Demonstrating Value
The Quinte Detention Centre Expansion Project is being delivered using a Design-Bid-Build (DBB) model. Key features of a DBB model include increased owner control over the project, as well as a high level of flexibility to respond to changing conditions and concerns.
Learn more about IO’s delivery models and associated features.
Terms of Use
These project documents are being made available on this website for informational purposes only. Neither Infrastructure Ontario nor the Ministry of the Solicitor General make any representation or warranty regarding the accuracy or completeness of the content or form of these documents.
Infrastructure Ontario and the Ministry of the Solicitor General, in their sole and absolute discretion, may choose to make available on this web site amendments, revisions, modifications or replacements to these documents. These documents remain open for further revision, modification, replacement or cancellation by Infrastructure Ontario and the Ministry of the Solicitor General at any time and in no event shall either Infrastructure Ontario or the Ministry of the Solicitor General be responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use of or reliance on the content of these documents.