Traffic Operations Centre

Location:
Etobicoke
Project Type:
Real Estate (Direct Delivery, Stipulated Sum)
Infrastructure Type:
Transportation
Project Cost:
$16.9 million
Client:
Ministry of Transportation

About the Project

Infrastructure Ontario was retained to construct a new facility that combines the management of traffic operations from two separate locations to one.  The state of the art facility accommodates the computers and communications systems that allow for real time operations and road condition reports across the province.  The facility is the hub for Transportation Management and Emergency Operations for the Central Region Highways, and more recently was the central traffic operations centre for the Pan-Am/Para Pan-Am Games. 

Project Status

  • Request for Qualification: April 2013
  • Contract Award: July 2013
  • Construction started: April 2014
  • Construction completed: February 2015

Winning Bidder

Buttcon Limited

Features

  • Video display wall
  • Electronic and fabric screens
  • 24/7 operations; including 24/7 control room with over 240 cameras to scan traffic
  • Ergonomically designed consoles
  • Dedicated second floor assembly areas that overlook video display wall and control room 

Terms of Use

These project documents are being made available on this website for informational purposes only. Neither Infrastructure Ontario nor its clients make any representation or warranty regarding the accuracy or completeness of the content or form of these documents.

Infrastructure Ontario in its sole and absolute discretion, may choose to make available on this website amendments, revisions, modifications or replacements to these documents. These documents remain open for further revision, modification, replacement or cancellation by Infrastructure Ontario at any time and in no event shall either Infrastructure Ontario or its clients be responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use of or reliance on the content of these documents.