Are you looking for:
The Scarborough Subway Extension (SSE) Advance Tunnel Project is the first phase of work for the 7.8 kilometre extension of TTC's Line 2 (Bloor-Danforth), from Kennedy Station to McCowan Road/Sheppard Avenue.
Starting with the tunnelling phase of work allows a significant portion of the subway extension to move forward on an accelerated timeline.
A separate contract to deliver the rest of the work includes building the stations, fitting-out the tunnel and installing and commissioning the systems to put the subway in service.
The scope of work includes:
Learn more about IO’s delivery models and the associated features.
These project documents are being made available on this website for informational purposes only. Neither Infrastructure Ontario nor Metrolinx makes any representation or warranty regarding the accuracy or completeness of the content or form of these documents.
Infrastructure Ontario and Metrolinx, in their sole and absolute discretion, may choose to make available on this website amendments, revisions, modifications or replacements to these documents. These documents remain open for further revision, modification, replacement or cancellation by Infrastructure Ontario and Metrolinx at any time and in no event shall either Infrastructure Ontario or Metrolinx be responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use of or reliance on the content of these documents.