Ontario Line - Elevated Guideway and Stations
- Location:
- Toronto
- Project Type:
- Progressive Design-Build
- Infrastructure Type:
- Transit
- Contract Value:
- To be announced at Financial Close
About the Project
The Elevated Guideway and Stations project is one of many contracts to deliver the Ontario Line, a 15.6-kilometre stand-alone rapid transit line that will connect the Ontario Science Centre to Exhibition/Ontario Place.
Latest News
Project Status
- Request for Qualifications: Nov. 17, 2022
- Short-list Bidders Selected: April 3, 2023
- Request for Proposals: April 3, 2023
- Development Partner Selected: February 14, 2024
Features
The scope of work for the contract includes:
- Three kilometres of an elevated guideway (bridge structures)
- Five elevated stations (Riverside-Leslieville, Gerrard, Thorncliffe Park, Flemingdon Park, Science Centre)
- One emergency exit building
- Interface with the maintenance and storage facility
- Interfaces with Eglinton Crosstown LRT Line 5 as well as sections of existing Metrolinx-owned rail corridor where Ontario Line trains will operate
Project Benefits
- Faster, more frequent and reliable access to rapid transit with more than 227,500 people will live within a 10-minute walk of an Ontario Line station
- Improve the quality of life for commuters by reducing daily travel time
- Reduce crowding on the existing Line 1 (Yonge-University) subway
- Up to 57,000 more jobs accessible by transit (in 45 minutes or less) for Toronto residents
- Economic and community growth along the future transit line and thousands of job opportunities annually during construction
- Reduction in traffic congestion, greenhouse gases and fuel consumption by providing an alternative transportation option
Demonstrating Value
The project is being delivered using a Progressive Design-Build (PDB) model. Key features of a PDB model include the opportunity for greater collaboration between the project owner, the successful bidder, project partners, and communities.
Learn more about IO’s delivery models and associated features.
Terms of Use
Infrastructure Ontario and Metrolinx, in their sole and absolute discretion, may choose to make available on this website amendments, revisions, modifications or replacements to these documents. These documents remain open for further revision, modification, replacement or cancellation by Infrastructure Ontario and Metrolinx at any time and in no event shall either Infrastructure Ontario or Metrolinx be responsible or liable, directly or indirectly, for any damage or loss caused or alleged to be caused by or in connection with the use of or reliance on the content of these documents.